Engineering Insurance

Claim

Engineering Insurance

engineering-insurance-protection-protect-coverage-512

Claim Flow

Contact us 24/7 by hotline or email to send the loss notification. Make a police report if the loss or damage is due to theft or burglary

Lovepik_com-450076498-Pack of Business Management Doodle Icons

Take necessary steps to minimise further loss or damage. Take photographs of the damaged items and retain the items for our inspection.

You may download a copy of claim form or request for the form to be sent to you Submit all necessary documents, information for our claim adjustment

After getting approval on the claim adjustment, you will receive your claim payment from us

Claim document list:

-Notice of loss (UIC form)
-Formal complaint letter (UIC form)
-Complaint letter sent to relevant third parties (if required)
-Subrogation letter of compensation (if required)
-Technical assessment report
– Minutes of the Insured’s internal investigation on assessment of the cause of loss and extent of damage
-Conclusion of investigation of the cause of the incident (Police, Authorities, Experts…)
-List of assets participating in insurance/Construction and installation contract
-Original records related to damaged assets (type, life cycle, warranty, purchase invoice or other related records)
-Quotation/Contract/Documents/Invoices for payment of repair/replacement/engraving costs
dress
-Other documents upon request depending on the case

*For claim payment timeline: 15 days from the date of receipt of complete and valid original documents for claim and insurance payment

Contact Information:

Liên hệ với chúng tôi